Total BGS Ltd was part of a million pound project with energy saving lights.

Our remit was to do site surveys and report electrical issues which include results found on site and issues that needed addressing. Many of the electrical drawings were either outdated or unavailable on site so we had to do a full site investigation to find all lighting points and live feeds.

The project included rewiring and/or upgrade lighting circuits to the current 17th edition so new LED high bay could be fitted though out the premises, the lights also required sensors which need to work in -30C and heights of 18 meters.

The sites operate 24/7 and most of the work was done either in cold stores (-30c) or on the roof of the cold store. Some of the sites also had moving racking which held its own challenges with light positions.

 

 

 

Requirements


Technical & Design Installation.
Temporary electrical supply.
Health and Safety.
Test and Inspect.

 