full
border
#666666
http://www.totalbgs.co.uk/wp-content/themes/zap-installable/
http://www.totalbgs.co.uk/
#7AB317
style1

Student Accommodation

Project Description

Student Accommodation – Coventry

Total BGS Ltd was responsible for the complete Mechanical & electrical design of a 125 Bedroom student accommodation in Coventry city centre.

A comprehensive calculations report was prepared and submitted to the Client prior to the install.

The report included the following: –

Calculations detailing the determination of the service capacities of the building,

  • Including diversity factors.
  • Cable calculations for each main and sub main cable set out on cable calculation schedules. Cable calculations for final sub circuits for a typical lighting circuit, ring main circuit and radial circuit.
  • Calculations to show lighting levels in each room or room type, or area (except bedrooms and bathrooms)
  • Air volumes to each ventilated space,
  • water tank sizing, hot water heater sizing, sound pressure levels, with all plant at maximum duty, at site boundary and nearest bedroom location, soil and waste pipe sizing

 

Requirements


Technical design for electrical &
mechanical.
Health & safety.
Test & inspect.

default
Loading posts...
link_magnifier
#5C5C5C
on
loading
off